|
Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
|
| Incoming-Outgoing Devices |
Not logged in |
 |
|
|
Message ID: 11
Entry time: Wed Oct 9 14:19:09 2019
|
| Author: |
Phe |
| Category: |
test with bakeout |
| Subject: |
Scrapper for ESR (for Markus Steck) |
| Expected: |
|
| Current Status: |
|
| New Expected Date: |
|
| Date Received: |
09.10.2019 |
| Status: |
DONE |
| Visual Inspection: |
Accepted |
| Test Started: |
14.10.2019 |
| Setup: |
Setup 2 |
| Test Ended: |
18.10.2019 |
| Result: |
Accepted |
| Outgoing Date: |
24.10.2019 |
| Taken by: |
Schwarz |
|
|
| Measurements asked as "urgent" for ESR. This piece was already measured in 2014, and then stored in an unkwon place. |
|
|