Message ID: 12
Entry time: Mon Oct 14 10:08:14 2019
|
| Author: |
Cristina |
| Category: |
leak check |
| Subject: |
Dipole chamber SIS100 First charge |
| Expected: |
|
| Current Status: |
|
| New Expected Date: |
|
| Date Received: |
10.10.2019 |
| Status: |
DONE |
| Visual Inspection: |
Accepted |
| Test Started: |
11.10.2019 |
| Setup: |
Customised |
| Test Ended: |
29.11.2019 |
| Result: |
Accepted |
| Outgoing Date: |
|
| Taken by: |
Stored in the TH |
|
|
| 6 dipole received on the KW41. Integral leak check and 1 test without bakeout
After the vacuum test the chambers must be inserted on the magnet: 1 chamber was not fitting easy into the magnet. It will go today (15.11.19) in the technology lab for mechanical measurements. |