Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices  Not logged in ELOG logo
Message ID: 21     Entry time: Thu Nov 14 14:00:28 2019
Author: Phe 
Category: test without bakeout 
Subject: Ref. Chamber for Beam Diagnostic Manipulator 
Expected:  
Current Status:  
New Expected Date:  
Date Received: unknown 
Status: DONE 
Visual Inspection: Accepted 
Test Started: 14.11.2019; 10:30 am 
Setup: Customised 
Test Ended: 22.11.2019 
Result: Cond. Accep. 
Outgoing Date: N/A 
Taken by: N/A 
Wide range gauge is now installed on the chamber. The previous test with cold cathode gauge failed due to broken gauge. Another complete new gauge is now installed on the chamber.
ELOG V3.1.5-fc6679b