Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
|
Incoming-Outgoing Devices |
Not logged in |
|
|
Message ID: 21
Entry time: Thu Nov 14 14:00:28 2019
|
Author: |
Phe |
Category: |
test without bakeout |
Subject: |
Ref. Chamber for Beam Diagnostic Manipulator |
Expected: |
|
Current Status: |
|
New Expected Date: |
|
Date Received: |
unknown |
Status: |
DONE |
Visual Inspection: |
Accepted |
Test Started: |
14.11.2019; 10:30 am |
Setup: |
Customised |
Test Ended: |
22.11.2019 |
Result: |
Cond. Accep. |
Outgoing Date: |
N/A |
Taken by: |
N/A |
|
|
Wide range gauge is now installed on the chamber. The previous test with cold cathode gauge failed due to broken gauge.
Another complete new gauge is now installed on the chamber. |