Message ID: 40     Entry time: Tue Dec 17 13:39:20 2019
Author: Phe 
Category: leak check 
Subject: Fasersonde Unilac -2 test 
Expected:  
Current Status:  
New Expected Date:  
Date Received: 17.12.2019 
Status: DONE 
Visual Inspection: Not Needed 
Test Started: 17.12.2019 
Setup: Customised 
Test Ended: 17.12.2019 
Result: Accepted 
Outgoing Date: 20.12.2019 
Taken by: Beam diagnostic 
This phase probe was tested by Christian Kolligs on the 12.12.2019 and it has leak rate of 1E-6 mbar.l/s.

The probe was then repaired by the Beam Diagnostic and tested again on the 17.12.2019 by Toni Coronato: it was leaky again. Repaired again and installed in the Unilac on the 20.12.19
Attachment 1: 20191217_134243.jpg  3.635 MB  | Hide | Hide all
20191217_134243.jpg