Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
|
| Incoming-Outgoing Devices |
Not logged in |
 |
|
|
Message ID: 40
Entry time: Tue Dec 17 13:39:20 2019
|
| Author: |
Phe |
| Category: |
leak check |
| Subject: |
Fasersonde Unilac -2 test |
| Expected: |
|
| Current Status: |
|
| New Expected Date: |
|
| Date Received: |
17.12.2019 |
| Status: |
DONE |
| Visual Inspection: |
Not Needed |
| Test Started: |
17.12.2019 |
| Setup: |
Customised |
| Test Ended: |
17.12.2019 |
| Result: |
Accepted |
| Outgoing Date: |
20.12.2019 |
| Taken by: |
Beam diagnostic |
|
|
This phase probe was tested by Christian Kolligs on the 12.12.2019 and it has leak rate of 1E-6 mbar.l/s.
The probe was then repaired by the Beam Diagnostic and tested again on the 17.12.2019 by Toni Coronato: it was leaky again. Repaired again and installed in the Unilac on the 20.12.19 |
|