Message ID: 4
Entry time: Mon Sep 30 11:15:47 2019
|
Author: |
Cristina |
Category: |
test with bakeout |
Subject: |
Detector Recoil chamber ESR |
Expected: |
|
Current Status: |
|
New Expected Date: |
|
Date Received: |
2.09.2019 |
Status: |
DONE |
Visual Inspection: |
Accepted |
Test Started: |
9.09.2019 |
Setup: |
Customised |
Test Ended: |
29.10.2019 |
Result: |
Cond. Accep. |
Outgoing Date: |
1.11.19 |
Taken by: |
Hillenbrand |
|
|
The chamber was brought in the lab without heating jackets, which where shipped on the 17.10.
Conditionally Accepted because the RGA after bakeout does not fulfil the requirements. |
|
|