Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
|
| Incoming-Outgoing Devices |
Not logged in |
 |
|
|
Message ID: 4
Entry time: Mon Sep 30 11:15:47 2019
|
| Author: |
Cristina |
| Category: |
test with bakeout |
| Subject: |
Detector Recoil chamber ESR |
| Expected: |
|
| Current Status: |
|
| New Expected Date: |
|
| Date Received: |
2.09.2019 |
| Status: |
DONE |
| Visual Inspection: |
Accepted |
| Test Started: |
9.09.2019 |
| Setup: |
Customised |
| Test Ended: |
29.10.2019 |
| Result: |
Cond. Accep. |
| Outgoing Date: |
1.11.19 |
| Taken by: |
Hillenbrand |
|
|
| The chamber was brought in the lab without heating jackets, which where shipped on the 17.10.
Conditionally Accepted because the RGA after bakeout does not fulfil the requirements. |
|
|