Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 9 of 9  Not logged in ELOG logo
Entry  Fri Feb 25 09:36:32 2022, Cristina, test with bakeout, Grid+manipolator, , , , KW7, DONE, , 23.02.22, Setup 1, 11.03.22, Accepted, ,  
Entry  Fri Feb 25 09:37:36 2022, Cristina, test without bakeout, 2 BMP, , , , 23.02.22, DONE, , 28.02.22, Mobile 3, 04.03.22, Accepted, 04.03.22, M.Müller 
Entry  Tue Mar 15 14:06:51 2022, Cristina, , Indian diagnostic chamber, , , , 11.03.22, DONE, Not Needed, 15.03.22, Customised, 16.03.22, Accepted, ,  
Entry  Tue Mar 22 11:27:51 2022, Cristina, test with bakeout, SIS100 Qpole, , , , , on-going, Not Needed, 22.03.22, Customised, , , ,  
Entry  Mon Mar 28 11:50:59 2022, Cristina, test without bakeout, Missing dipole, , , , 28.03.22, TO DO, , , , , , ,  
ELOG V3.1.5-fc6679b