Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 9 of 9  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Dateup Taken by Text Attachments
  3   Mon Sep 30 11:11:26 2019 Cristinatest with bakeoutLaser chamber -WintersBeginning 2019Delayed 16.08.2019DONEAccepted30.08.2019Customised12.02.2020AcceptedKW10D.Winters
The measurement was stopped because of the
wrong heating jackets
 Laser_chamber.jpg 
  86   Mon Sep 14 09:16:54 2020 Cristinatest with bakeoutMirror Laser cooling SIS100   14.09.2020DONEAccepted6.10.20Mobile 221.10.20Cond. Accep.KW47D.Winters    
  35   Thu Dec 12 09:20:54 2019 Cristinatest with bakeoutIPM SIS100-GiacominiJannuary 2020DelayedUnknown21.04.2020DONENot Needed04.05.2020Customised15.05.2020AcceptedMai/JuniBrough to the TH    
  21   Thu Nov 14 14:00:28 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator   unknownDONEAccepted14.11.2019; 10:30 amCustomised22.11.2019Cond. Accep.N/AN/AWide range gauge is now installed on the chamber.
 The previous test with cold cathode gauge
failed due to broken gauge.  

Another
  
  133   Tue Jun 8 10:19:14 2021 Cristinatest without bakeoutDipole Module   25.05.21DONENot Needed25.05.21Customised27.07.21Cond. Accep.THF.Kaether    
ELOG V3.1.5-fc6679b