Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 9 of 9
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
165 Entries
Goto page
Previous
1
,
2
,
3
...
7
,
8
, 9
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
Text
105
Tue Dec 1 11:49:07 2020
Cristina
test with bakeout
Bellows IPM SIS18-Second measurement after cleaning
12.10.20
DONE
Not Needed
12.10.20
HEBT Setup
14.10.20
Accepted
15.10.20
Zentrale Dienst
82
Fri Sep 11 09:59:20 2020
Cristina
test without bakeout
Bellows IPM SIS18
01.09.2020
DONE
Refused
02.09.2020
HEBT Setup
03.09.2020
Refused
11.09.2020
Zentrale Dienst (back to Giacomini)
78
Wed Jun 17 12:58:02 2020
Cristina
test without bakeout
SIS100 Dipole 07-6-016-4
----
------
17.06.2020
DONE
Accepted
17.06.2020
HEBT Setup
19.06.2020
Cond. Accep.
22.06.2020
brought back to the TH
49
Thu Feb 6 12:47:18 2020
Cristina
leak check
Interconnction bellows between Dipole and Quadrupole
October
On schedule
3.11.20
DONE
Accepted
04.11.20
Customised
04.11.20
Refused
04.11.20
in Büro of S.Wilfert
79
Fri Aug 28 11:51:30 2020
Phe
test without bakeout
SIS100 dipole 07-00009-020-01
DONE
Accepted
26.08.20
HEBT Setup
28.08.20
Refused
1.09.20
in the TH