HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy  Not logged in ELOG logo
Message ID: 10     Entry time: Wed May 4 22:56:22 2022
Author: Rodolfo, Sebastian, Konstantin 
Category: Laser 
Subject: Laser step complete, scan complete fixed 
"Laser step complete" and "laser scan complete" are working again.

Problems:
1) Connections were wrong in the Software. 
2) Sometimes the connection to "laser scan complete" was lost (Wackelkontakt).
3) The VI was initialized with the wrong LabJack Channels.

Now:
1) fixed connections in the software.
2) switch to an other "channel" of the LabJack device for "laser scan complete".
3) The channels in the Cobra VI are for...
laser scan complete -> Channel 5
laser step complete -> 6

We definetely should keep an eye and check frequently the signals, that we do not have a lost connection (Wackelkontakt) again of these 2 channels.
ELOG V3.1.5-fc6679b