HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy  Not logged in ELOG logo
Message ID: 106     Entry time: Wed Jun 1 00:16:02 2022
Author: Konstantin, Simon 
Category: DAQ 
Subject: Timing 209Bi thick target 
Timing for the final measurements on 209Bi was determined for the new frequency 1.93777MHz. Peak positions are

PD NO 106
PD SO 141.5
PMT MIDDLE 45 (due to the broad temporal structure difficult to determine)

Center between PDs is 123.75. Difference to PMT MIDDLE is 78.75. This is ~3 bins larger than the half period of 75. 
Attachment 1: Timing_209Bi_final.png  23 kB  Uploaded Wed Jun 1 01:16:25 2022  | Hide | Hide all
Timing_209Bi_final.png
ELOG V3.1.5-fc6679b