HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
|
Dielectronic recombination-assisted laser spectroscopy |
Not logged in |
|
|
Message ID: 106
Entry time: Wed Jun 1 00:16:02 2022
|
Author: |
Konstantin, Simon |
Category: |
DAQ |
Subject: |
Timing 209Bi thick target |
|
|
Timing for the final measurements on 209Bi was determined for the new frequency 1.93777MHz. Peak positions are
PD NO 106
PD SO 141.5
PMT MIDDLE 45 (due to the broad temporal structure difficult to determine)
Center between PDs is 123.75. Difference to PMT MIDDLE is 78.75. This is ~3 bins larger than the half period of 75. |
|
|