HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy  Not logged in ELOG logo
Message ID: 13     Entry time: Fri May 6 10:35:06 2022
Author: Sebastian 
Category: DAQ 
Subject: laser step complete cabling changed 
I changed the laser step complete cabling from a quad coinc (see attached picture) to a Logic Fan In / Fan out (same as laser scan complete).
The "detour" through the quad coinc yielded to a very short laser step complete signal of ~500ns...

Due to the change it is now ~15µs long and has the same length as the laser scan complete signal (~15µs).
Attachment 1: stepComplete_beforeChange_QuadCoincCabling.PNG  425 kB  Uploaded Fri May 6 11:41:06 2022  | Hide | Hide all
stepComplete_beforeChange_QuadCoincCabling.PNG
ELOG V3.1.5-fc6679b