HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy  Not logged in ELOG logo
Message ID: 22     Entry time: Mon May 9 17:16:34 2022
Author: Carsten 
Category: Accelerator 
Subject: Important: New ESR pattern - requies action for XUV detector in/out 
The ESR pattern is enhanced compared to the thorium experiment by additional machines that can be  used for cooling/waiting in order to optimize 208Bi yield.
As a consequence, the sub chain numbers (previous: virtuelle Beschleuniger) are changed. The new numbers still have to be dialed in into the devices in the Messhütte and the automatic in/out of the XUV-detector tested-
ELOG V3.1.5-fc6679b