HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy  Not logged in ELOG logo
Entry  Mon May 9 19:56:41 2022, Zoran, Accelerator, status Monday evening 
    Reply  Tue May 10 09:05:19 2022, Zoran, Accelerator, status Monday evening 22-05-09_200006_20220509_170137_tcl1024_dcct.png
Message ID: 25     Entry time: Tue May 10 09:05:19 2022     In reply to: 24
Author: Zoran 
Category: Accelerator 
Subject: status Monday evening 
> The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport 
and the devices for the 
> ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment 
before tomorrow morning.
> 
> => the night shift will not take place, unless some laser adjustments need to be done (so far we see no problems)
> => the morning shift does not need to come at 6AM. My guess is that before the morning briefing at 8:30 there will be no news.
> 
> The ESR cave is closed again. Talk to the main control room if you need access.

Status SIS on Monday evening. ESR setting up starting on Tuesday morning. There is some prospect of getting more ions by setting up multi-multiturn 
injection, however still uncertain.
Attachment 1: 22-05-09_200006_20220509_170137_tcl1024_dcct.png  227 kB  Uploaded Tue May 10 10:06:35 2022  | Hide | Hide all
22-05-09_200006_20220509_170137_tcl1024_dcct.png
ELOG V3.1.5-fc6679b