HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy  Not logged in ELOG logo
Message ID: 6     Entry time: Tue Apr 26 18:15:19 2022
Author: Rodolfo 
Category: Detectors 
Subject: XUV-Detector and Cu-Mirror 
Concerning the moveable detectors:

- I have switched off the power supply and cooling (heat exchanger) for the Cu-mirror.

- The heat exchanger for the XUV-detector is still ON. The water level in the heat exchanger is still OK.
ELOG V3.1.5-fc6679b