HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy  Not logged in ELOG logo
Entry  Fri May 13 16:55:58 2022, Danyal, Carsten, Phillip, Wilfried, General, End of E128 Beamtime  
    Reply  Mon May 16 14:20:05 2022, Ragan, Danyal, Carsten, Phillip, Wilfried et al., General, E128 Beamtime  
Message ID: 68     Entry time: Fri May 13 16:55:58 2022     Reply to this: 69
Author: Danyal, Carsten, Phillip, Wilfried 
Category: General 
Subject: End of E128 Beamtime  
Dear all,

unfortunately, the E128 experiment must now come to an early end. 
The problem(s) with the injection septum are severe and no work around solution (with acceptable risks) could be found. 
Several things were tried, but without hope. 

Many thanks to everybody involved during the preparation time and the shifts during the beamtime. 

Best wishes,

Wilfried
ELOG V3.1.5-fc6679b