The "dead" Q-Switch signal was converted
two times... This explains why in the
Thorium experiment the Q-Switch signal
(ch15) was empty.
First conversion from TTL to NIM in the
ESR Laserlab and unfortunately the signal
was plugged in a second Level Adapter as
TTL in
the Messhütte and was "again" converted
into a NIM for DAQ1/2.
Now the Q-Switch is converted from TTL to
NIM in the ESR Laserlab. The NIM is
afterwards guided through a Logic Fan
In/Out to the 2 DAQs. |