HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy  Not logged in ELOG logo
Message ID: 89     Entry time: Mon May 30 09:28:43 2022
Author: Ken, Kristian, Simon, Ragan 
Category: Detectors 
Subject: XUV-Detector 
9:27 XUV-Detector is running again.

-5V cathode, 8A main coil, 2.4A sec.coil
Rate without beam was: 
Park position: ~300Hz 

Pump beneath the detector is now shut down, new rate: <10Hz.

Threshold was adjusted to trigger only on "nice" signals. 

Rate with beam in and laser:
Park position: ~400Hz
147mm: ~1.4kHz
 
with 2e6 ions
ELOG V3.1.5-fc6679b