Position of T-Scrapers |
|
|
We have determined the position of the H-like 208Bi ion beam using the T-Scrapers. The position actually did not change in comparison to the position of H-like 209Bi.
Here we have the values where the beam was "gone"
|
device | move in dir. | gone (mm) | x0 (mm)
| |
GECEDS1VU | up | 0.7 |
| |
| | |
| |
GECEDS1HA | right | -22 | -4.7
| |
| left | -13.0 |
| |
| | |
| |
GECEDS2VU | up | 0.0 |
| |
| | |
| |
GECEDS2HA | right | -18.5 | 3.1
| |
| left | -9.5 |
|
Below you can see a screenshot with the settings of the beam stabilization system. |
|
|