HOME ESR EXPERIMENTS LABS etc
NucAR lab laser_lab Fritz-Bosch-Lab X-Ray Lab target Beavertail
  Beavertail, Page 2 of 2  Not logged in ELOG logo
ID Date Author Category Subject Text Attachments
  22   Sat Mar 29 15:51:46 2025 CG, JG, MC, IDGeneralDAQ setup********************************************
** Setup of DAQ x86l-131 (outside pocket)
**
  
  23   Sat Mar 29 17:19:46 2025 CG, JG, MC, IDGeneralSample data fileData files written to /mnt/raw.data/e0203_e0018.

From MBS computers:
  
  24   Sat Mar 29 17:53:13 2025 CG, ID, MCElectronicsBias remote controlThe MHV modules are set up for remote control.
This can be accessed via the mesycontrol
software running on x86l-128.
  
  25   Mon Mar 31 17:55:16 2025 JGDAQDAQ overviewThe DAQ is running of 4 different nodes/PCs,
that can be accessed by ssh using the user
litv-exp.
  
  26   Mon Mar 31 18:21:37 2025 JGDAQESR scaler mappingThis is the list of scaler channels used at
the VME ESR DAQ on x86l-204:
  
  27   Mon Mar 31 18:35:46 2025 JGDAQlmd files on ESR NASThe files of each MBS node or the timesorter
are written to the ESR NAS by the RFIO server.
The server is running on the virtual machine
  
  28   Tue Apr 1 17:18:10 2025 ID, MC, CJGDetectorsBoth PLEIADES detectors in beamWe started inserting the inside and outside
detector, see
https://elog.gsi.de/esr/E0203_E0018/46
  
  30   Tue Apr 1 22:41:52 2025 CGDetectorsClimbing leakage currentsThe experiment has been running stably during
the afternoon.
DAQ rates have remained constant and the
 highLeakageCurrents.png 
  31   Tue Apr 1 23:00:41 2025 CGGeneralRun stopped and detectors moved backDue to the continued rise in leakage currents,
I have stopped the run, moved the detectors
completely back and turned off the 
  
ELOG V3.1.5-fc6679b