HOME ESR EXPERIMENTS LABS etc
NucAR lab laser_lab Fritz-Bosch-Lab X-Ray Lab target Beavertail
  Beavertail  Not logged in ELOG logo
Message ID: 14     Entry time: Mon May 29 12:23:48 2023
Author: Guy Leckenby, Chris Griffin 
Category: Electronics 
Subject: Old flange noise re-tests 
Whilst constructing a new flange to replace the old one, we did some tests again to compare the performance of new vs old flange.
See attached images:
1. Old flange, in the lab, no grounding attempts made, biased, n-sides.
2. Old flange, lab, ground plate connected to flange, biased n-sides.
This comparison shows that for the old flange, connecting the ground plane to the flange improved the 50Hz noise. This was also true in the ESR, so all following screenshots had this 
ground connection.

3. Old flange, in the ESR, grounded, biased, n-sides.
4. Old flange, in the ESR, grounded, biased, p-sides.
5. New flange, in the ESR, biased, n-sides.
Attachment 3 v 5 is an apples to apples comparison. This confirmed that even for the best case scenario, the noise in the old flange is an order of magnitude worse. Note that the n-
sides have the worse profile, and for the old flange, the high frequency noise is almost the same size as the pulser. For the new flange, that same noise can be seen, but much smaller 
magnitude.
Grounding on the new flange made no appreciable difference. But in general, we think connecting the electronic ground to the ESR is the best decision. 
Attachment 1: 26.05.23-MHLab-Old_Flange_Biased_No_Grnd_Con_n-sides.PNG  22 kB  | Show | Hide all | Show all
Attachment 2: 26.05.23-MHLab-OF-B-YGC-n-sides.PNG  22 kB  | Show | Hide all | Show all
Attachment 3: 26.05.23-ESR-OF-B-YGC-n-sides.PNG  35 kB  Uploaded Mon May 29 13:28:57 2023  | Hide | Hide all | Show all
26.05.23-ESR-OF-B-YGC-n-sides.PNG
Attachment 4: 26.05.23-ESR-OF-B-YGC-p-sides.PNG  33 kB  Uploaded Mon May 29 13:29:09 2023  | Hide | Hide all | Show all
26.05.23-ESR-OF-B-YGC-p-sides.PNG
Attachment 5: 26.05.23-ESR-NF-B-NGC-n-sides.PNG  29 kB  Uploaded Mon May 29 13:29:21 2023  | Hide | Hide all | Show all
26.05.23-ESR-NF-B-NGC-n-sides.PNG
ELOG V3.1.5-fc6679b