The inner detector was moved into position.
The device control for the outer detector is not responding and I am not an expert/don't know how to make it work.
See ELog: https://elog.gsi.de/esr/E0203_E0018/126
Inner detector (x86l-124 BGO)
Device: GE01DD2IG
Position: +20 mm
Scraping beam: not possible
At 19:00 the timesorter slowed down and stopped responding. at 19:56 the the inner detector was retracted (pulled back further from the beam)
Outer detector (x86l-131 GAGG)
Device: GE01DD2AG
Position: -127 mm
Scraping beam: n/a
This could be an interesting test of the detector leakage current response to being in place (i.e. only the inner detector is in place, do all leakage currents increase or
only that detector?)
Started taking data with file run0017.lmd @ 17:35.
Will continue to run for a few hours this evening and closely monitor leakage currents.
Go4 is running on x86l-184 connected to stream server. |