HOME ESR EXPERIMENTS LABS etc
NucAR lab laser_lab Fritz-Bosch-Lab X-Ray Lab target Beavertail
  Beavertail  Not logged in ELOG logo
Message ID: 37     Entry time: Fri Apr 4 16:27:11 2025
Author: CJG, GL, MC, JG, ID 
Category: General 
Subject: PLEIADES in position 
Inner PLEIADES detector moved into position at +2mm.
Again, the outside pocket cannot be moved.

run0022 started 16:26:50.

Run stopped at 16:47:20.

Going to attempt a bias curve on one detector. With the present leakage currents, the voltage drop induced is close to the applied bias voltage.
ELOG V3.1.5-fc6679b