HOME ESR EXPERIMENTS LABS etc
NucAR lab laser_lab Fritz-Bosch-Lab X-Ray Lab target Beavertail
  Beavertail  Not logged in ELOG logo
Message ID: 7     Entry time: Tue Jun 28 17:42:53 2022
Author: Guy Leckenby 
Category: DAQ 
Subject: Cabling Changes 
In the previous signal map, I incorrectly mapped the DSSD channels. To correctly read out the DSSD for the new test, we will swap the Lemo cables into the MSI-8, rather then messing with the flange. Hence, plug the old labels into the new channels as outlined 
in the attached table.
Attachment 1: DSSD_New_Ch.png  3 kB  Uploaded Tue Jun 28 19:08:32 2022  | Hide | Hide all
DSSD_New_Ch.png
ELOG V3.1.5-fc6679b