HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  nuclear two-photon decay 2024  Not logged in ELOG logo
Message ID: 102     Entry time: Sun May 19 14:17:57 2024
Author: Shahab, Kanika,hongfu li,xing xu 
Category: DAQ 
Subject: center frequency change for 96Sr 
aiming for 96-Sr:


410 MHz:

The plunger position for 410 is 45, which should correspond to the 408.998 MHz which is expected position for 96Sr. The first file is at 14:38.


245 MHz:

The center frequency is changed to 244.235723 MHz for 96Sr, the new plunger position is 300.The first file is at 14:5
ELOG V3.1.5-fc6679b