HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  nuclear two-photon decay 2024  Not logged in ELOG logo
Message ID: 98     Entry time: Sat May 18 16:45:15 2024
Author: Helmut, Yury 
Category: Accelerator 
Subject: setting for 96Sr (98Y) 
To have a few more lines the setting actually is not on 96Sr directly, but on 98Y39+.
98Y is also the one set to be isochronous. 
But in addition the SIS-energy is shifted by -0.9 MeV/u to get at least better transmission for 96Sr.
Attachment 1: TEline-ESR-100Mo_98Y.lpp  168 kB  Uploaded Sat May 18 17:54:28 2024  | Show | Show all
Attachment 2: 2024-05-18_17-03-55_ESR_ISO_13May24_98Y.C1.txt  23 kB  Uploaded Sat May 18 18:06:36 2024  | Show | Show all
Attachment 3: 2024-05-18_17-05-31_SIS18_FAST_ESR_100Mo_13May24_98Y.C1.txt  27 kB  Uploaded Sat May 18 18:06:42 2024  | Show | Show all
ELOG V3.1.5-fc6679b