Tue May 14 23:46:04 2024, David, Asahi, Shahab, DAQ, Trigger setup
|
GENESYS setup trigger
screen shot
|
Wed May 15 01:11:45 2024, David, Asahi, Shahab, Chris, Ruijiu, General, Time optimisation
|
DAQ stopped at 01:11 to optimise data taking cycle of RSAs.
Changed data writing time from 2s -> 1.8s. |
Tue May 14 21:41:11 2024, Shahab, Runs, Test Screenshot
|
|
Sat May 18 13:13:45 2024, Yuri, Taka, Xinliang, Sophia, Yuanming, Ragan, Shahab , Calibration, Shorter shots with 98 Mo
|
now making shorter shots with 98-Mo
3 seconds each
50 MSPS
|
Mon May 20 05:32:17 2024, Gregor, Cagla, Accelerator, Short beam interruption
|
We lost the beam for ~2min at (from ~5:28 till ~5:30). Everything seems to be back at the same state. |
Mon May 20 09:01:51 2024, Oliver, Jelena, General, Shift news
|
Data collection runs smooth so far.
Yuri Litvinov will start modifying SP magnets now. The resolution will change. |
Sun May 19 14:11:29 2024, Yuri, Sergey, Accelerator, Sextupoles
|
at 13:00
scrapers in the ESR are moved to block the most outside orbits
E02DS3HG out -> -60 mm
|
Thu May 16 11:20:10 2024, Sergey, Accelerator, Screenshot of ESR pattern with 140 repetitions (each is 100 ms)
|
Injection Beam Process: 100ms
Bunching Beam Process: 16ms
Intermediate Beam Process: 100 ms, which is repeated 140 times
|
Sat May 18 00:37:52 2024, Helmut, Wolfram, Shahab, David, Xinliang, Runs, SIS beam gone
|
|
Mon May 20 14:02:03 2024, Jelena, Oliver, Shahab, DAQ, Retune 245 MHz
|
Mew numbers for 245 MHz plunger is 190 (both) |
Wed May 15 01:27:13 2024, David, Asahi, Shahab, Chris, DAQ, Restarted data taking
|
Data taking restarted at 01:27 following re-alignment of the RSAs.
Also reduced number of processing threads to 10. |
Sat May 18 14:43:59 2024, Yuri, Accelerator, Reduce intensity, 98Mo42+
|
reduce intensity
eexds2ha 7mm --> 9 mm
e02ds3hg -69 mm -- stays
|
Thu May 16 11:13:05 2024, Mayr, Hannes, Runs, Rates
|
With the new timing, the rates now look like can be seen in the screenshot. |
Sat May 18 02:04:38 2024, Yoshi, Ohnishi, DAQ, RSA01 run
|
RSA01 was stopped from 19:25, it restart now. |
Thu May 9 09:12:59 2024, Dounia, Shahab, DAQ, RSA file sync
|
RSA file sync with server was up with LXIR131 through to the Lustre. |
Mon May 20 13:26:55 2024, Jelena, Oliver, Shahab, General, Plunger values
|
plunger 150 for 250
plunger 48 for 410 |
Thu May 16 07:50:39 2024, Mayr, Hannes, Runs, Peaks with very high particle rate
|
Peaks in the particle diagram going to unusual high 1.4e9 particles. |
Wed May 15 00:06:10 2024, David, Asahi, Shahab, Chris, Ruijiu, DAQ, Optimizing the 410 resonance curve
|
|
Wed May 15 00:17:24 2024, David, Asahi, Shahab, Chris, Ruijiu, DAQ, Optimizing the 245 resonance curve
|
|
Fri May 17 21:56:58 2024, Jelena B, Zsolt P., Accelerator, Optimizing setting
|
We are optimizing setting for 96Sr
start time: 21:52 |
|