HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  nuclear two-photon decay 2024, Page 2 of 6  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Tue May 14 23:46:04 2024, David, Asahi, Shahab, DAQ, Trigger setup 2024-05-14_23-46-56-017.png
Entry  Wed May 15 01:11:45 2024, David, Asahi, Shahab, Chris, Ruijiu, General, Time optimisation 
Entry  Tue May 14 21:41:11 2024, Shahab, Runs, Test Screenshot 2024-05-14_21-39-01-112_tcl1048.png
Entry  Sat May 18 13:13:45 2024, Yuri, Taka, Xinliang, Sophia, Yuanming, Ragan, Shahab , Calibration, Shorter shots with 98 Mo 
Entry  Mon May 20 05:32:17 2024, Gregor, Cagla, Accelerator, Short beam interruption 
Entry  Mon May 20 09:01:51 2024, Oliver, Jelena, General, Shift news 
Entry  Sun May 19 14:11:29 2024, Yuri, Sergey, Accelerator, Sextupoles 
Entry  Thu May 16 11:20:10 2024, Sergey, Accelerator, Screenshot of ESR pattern with 140 repetitions (each is 100 ms) 2024-05-16_11-19-01-545.png
Entry  Sat May 18 00:37:52 2024, Helmut, Wolfram, Shahab, David, Xinliang, Runs, SIS beam gone 
Entry  Mon May 20 14:02:03 2024, Jelena, Oliver, Shahab, DAQ, Retune 245 MHz 
Entry  Wed May 15 01:27:13 2024, David, Asahi, Shahab, Chris, DAQ, Restarted data taking 
Entry  Sat May 18 14:43:59 2024, Yuri, Accelerator, Reduce intensity, 98Mo42+ 
Entry  Thu May 16 11:13:05 2024, Mayr, Hannes, Runs, Rates 2024-05-16_11-10-57-933_tcl1064.png
Entry  Sat May 18 02:04:38 2024, Yoshi, Ohnishi, DAQ, RSA01 run 
Entry  Thu May 9 09:12:59 2024, Dounia, Shahab, DAQ, RSA file sync 
Entry  Mon May 20 13:26:55 2024, Jelena, Oliver, Shahab, General, Plunger values 
Entry  Thu May 16 07:50:39 2024, Mayr, Hannes, Runs, Peaks with very high particle rate 2024-05-16_07-49-53-757_tcl1064.png
Entry  Wed May 15 00:06:10 2024, David, Asahi, Shahab, Chris, Ruijiu, DAQ, Optimizing the 410 resonance curve 2024-05-15_00-05-36-583.png
Entry  Wed May 15 00:17:24 2024, David, Asahi, Shahab, Chris, Ruijiu, DAQ, Optimizing the 245 resonance curve 2024-05-15_00-18-18-752.png
Entry  Fri May 17 21:56:58 2024, Jelena B, Zsolt P., Accelerator, Optimizing setting 
ELOG V3.1.5-fc6679b