HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
E0075
E0203_E0018
E0052_2025
|
LIBELLE 2025 |
Not logged in |
 |
|
Message ID: 21
Entry time: Sat May 10 00:52:21 2025
|
Author: |
Finn, Simon, Konstantin, Rodolfo |
Category: |
DAQ |
Subject: |
Bunching - ammendment late shift |
|
|
Some 209Bi80+ beam was provided for tests measurement over the weekend. Currently the beam is bunched at the second harmonic, corresponding to a bunching frequency of 3.87421MHz and a revolution frequency of 1.937105MHz. The setting of the rate dividers were 2 and 99. Two is important since we are working with the second harmonic, and 99 provides approximately 20kHz, which is expected by the DAQ. The measurement of the frequency was performed in the Manipulation subchain SC8.
Rodolfo. In SetParameters.C was written another value (namely: 1.9370959 MHz). I changed this value to 1.937105 MHz. |