Message ID: 34     Entry time: Sun May 11 03:23:18 2025
Author: Simon, Konstantin 
Category: Calibration 
Subject: Delaytime measurement 
We performed another set of delay time measurements to substitude the broken channel of PMT middle. We did this in two step:

1.) Measurement of the total delay between the origin of a signal (AFG 10kHz, -50mV amplitude) and the detection directly before the DAQ after traveling through the long calibration cable (~50m) and the individual channel line. During this step we corrected the delay time if necessary by means of an OG 8000. This was only mandatory for PMT middle. We considered the traveling time of 46ns for all PMT detectors. We didn't measure the delay of PD North and Particle Detector south, since all other channels were fine and the delay after the OG 8000 were reasonable.

2.) Measurement of the delay within the OG 8000 octal gate generator.

Total delay / ns OG 8000 delay / ns
Photodiode North - 69.6
Photodiode South 1266.6 73.6
PMT Middle 1220.6 156.6
PMT North 1220.6 167.4
PMT Copper 1220.6 166.0
Particle South - 337.6