At about 22:30 we switched back to the bunched beam.
The new NTCAP directory is IQ_2025-05-11_22-37-04, started NTCAP Schottky data.
Same ramp as before 24 eV to 4 eV. 1001 steps dE = 0.02 eV,
Measurement step 40 ms / cooling step 40 ms.
The ramp is repeated 15 times.
I_el = 500 mA.
Opened file run_0016.lmd
Jonas checked that the bunching works using the scope in the main control room.
The DR peak appears after very few scans. |