HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
E0075
E0203_E0018
E0052_2025
|
LIBELLE 2025 |
Not logged in |
 |
|
Message ID: 54
Entry time: Tue May 13 21:37:09 2025
|
Author: |
Carsten |
Category: |
Runs |
Subject: |
DR run with bunched beam / 500 mA /208Bi80+ |
|
|
Just changed settings towards a new scanning range and bunched beam.
Stopped and started NTCAP, now: IQ_2025-05-13_21-01-44
new ADC file
NEW ENERGY RANGE AND TIMING
Scan from 21 eV to 11 eV with 1001 steps and Delta E = 0.01 eV
8 repetitions
SubTriggerTiming:
5800
10200
10400
10600
200
200
200
500 mA / bunched beam; other settings as before
run0035.lmd opened
Please note that the peak now looks differently, in particular in looks broader (dE = 0.01ev instead of dE =0.02 eV))and is at a different position |