Message ID: 66     Entry time: Thu May 15 13:40:47 2025
Author: Carsten 
Category: Runs 
Subject: DR run DC with 300mA and very fine stepwidth 
Just changed settings towards a new scanning range and bunched beam.
NTCAP, now: IQ_2025-05-15_12-00-29
new ADC file
NEW ENERGY RANGE
Scan from 21 eV to 11 eV with 4001 steps and Delta E = 0.025 eV
3 repetitions (first run 4)
SubTriggerTiming:
5800
10200
10400
10600
200
200
200

300 mA / DC beam;

run0051.lmd opened

14:25 closed file 51
Changed to 2 repetitions
opened file 0052.lmd

15:46 clsoed file 0052.lmd - in the last injection the ramp was not started (DAC was clamped)

file 0053.lmd/ 0054 / 0055 must not be used.

File 0056 higher intensities timing optimizations - don't trust the first 200 channels.
File 0056 end (last injection) SC not stopped - beam destroyed.

19:19: Opened File 0057.lmd
New NTCAP directory: IQ_2025-05-15_19-00-41
File 0058.lmd running with multiturn injection in SIS.

At end of file 0058 injections (forgot to stop SC)
opened and closed file 0059 (good data)
Stopped NTCAP.

Preparations for HV calibration with DC beam.