HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025  Not logged in ELOG logo
Message ID: 75     Entry time: Fri May 16 18:37:32 2025
Author: Rodolfo, Carsten, Wilfried, Zoran, Ragandeep, Nils 
Category: Laser 
Subject: Timing 
After some minor adjustments for the laser done by Rodolfo, the laser is back 
at ESR and visible by the PD-SO.
We checked the timing between the cooling signal of the e-cooler and the 
signal produced of the PD-SO, which is suppose to be at the end of the 
cooling ramp - seems to work as expected. Picture is attached.

Note added (Carsten): The "cool" signal is generated by the microcontroller. It 
is only in sync if the laser signal is put on the input line to the microcontroller. 
Otherwise both have independent clocks.
Attachment 1: Screenshot_2025-05-16-18-31-35.png  65 kB  Uploaded Fri May 16 19:49:36 2025  | Hide | Hide all
Screenshot_2025-05-16-18-31-35.png
ELOG V3.1.5-fc6679b