HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025  Not logged in ELOG logo
Message ID: 82     Entry time: Sat May 17 08:36:20 2025
Author: Wilfried, Christopher, Kristian  
Category: Laser 
Subject: Laser Scans in coasting beam 
switched to coasting beam
bucketfill (RF manipulation) (SC7, ...): [[3.0],[3.0]] ---> [[3.0],[0.0]]


Time File PTB 32 PTB 33 Ohmlabs ESR intensity SC8 / 1e6 Typical SIS injections / 1e9 NTCAP file comments
2025-05-17 07:43 113 205826 205827 205820 2 3.0 SC_2025-05-17_08-18-54 interestingly we see an ion beam after deceleration that is comparable to the bunched mode, even though yesterday evening the losses were a factor 3-4 higher in coasting beam mode
2025-05-17 08:34 114 205827 205828 205820 1.5 3.0 SC_2025-05-17_09-00-28
2025-05-17 09:41 115 205821 205827 205829 0.9 2.5 SC_2025-05-17_09-41-18 late start of the laser scan. DR ramp stopped already at laser step 58. We see a resonance-like structure at laser step 28-32
2025-05-17 10:20 116 205822 205827 205829 1.0 2.0 SC_2025-05-17_10-19-49 waited 30 s after initialization of ramp, then started laser scan
2025-05-17 10:58 117 205822 205828 205829 1.0 2.2 SC_2025-05-17_10-57-38 with waiting again
2025-05-17 11:37 117 205821 205826 205828 1.0 2.2 SC_2025-05-17_11-15-37 started NTCAP after injection #10, laser scan after waiting for 30s again, NTCAP not stopped, start of next injection cycle with about 10 injections included
ELOG V3.1.5-fc6679b