HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025  Not logged in ELOG logo
Message ID: 83     Entry time: Sat May 17 11:57:13 2025
Author: Wilfried, Christopher, Kristian 
Category: Laser 
Subject: Scans with bunched beam 
switched to bunched beam
bucketfill (RF manipulation) (SC7, ...): [[3.0],[0.0]] ---> [[3.0],[3.0]]

Time File Ohmlabs PTB 32 PTB 33 ESR intensity SC8 / 1e6 Typical SIS injections / 1e9 NTCAP file comments
2025-05-17 12:22 119 205820 205827 205829 1.0 2.2 SC_2025-05-17_12-00-55 laser spot is moving more than before
2025-05-17 13:00 120 205821 205826 205827 1.0 3 SC_2025-05-17_13-00-45 we asked HKR to optimize the SIS before the scan. The injected beam current is higher but not the final current in the ESR, started the ramp manually
2025-05-17 13:40 121 205821 205827 205828 1.0 3 SC_2025-05-17_13-00-45
2025-05-17 14:30 122 205821 205827 205828 1.0 3 NTCAP ist angeblieben
ELOG V3.1.5-fc6679b