HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  LIBELLE 2025  Not logged in ELOG logo
Message ID: 9     Entry time: Wed May 7 20:31:52 2025
Author: Carsten 
Category: DAQ 
Subject: DRALS cabling (DR part) 
Green Corner, patch panel to ESR
All signals from/ to ESR TTL 5V.
Signals are GND decoupled with grey boxes! Don't use the signals directly.
    [1] New Ramp (NR) / Meas Gate
    [2] New Step (NS)
    [3] End of Ramp (ER) / COOL
    [4] to ESR: Start Measure Trigger
    [5] to ESR: Laser Trigger (~ 30 Hz)
    [6] MEAS0
    [7] MEAS1
    [8] VFC

Patch Panel "Green Corner" (DR) <-> "Blue Corner" (Laser)
Signals are neg NIM unless otherwise indicated
(i.e. the two signals from/to the DR Trigger side need to be TTL)
    [11] to DR side: Laser Trigger (TTL) => to do => done
    [12] from DR side Injection; signal comes from DR DAQ!!! => to do
    [13] Meas Gate
    [14] VFC
    [15] to DR side: Part Det South (Cooler) => to do
    [16] to DR side: Part Det North (Gas jet) => to do
    [25] COOL
    [26] MEAS0
    [27] MEAS1
    [28] New Step (NS)
    [29] SubTrig 1
    [30] SubTrig 2
    [31] SubTrig 3
    [32] SubTrig 4

NACOM 1 => Signals ar ORed as Master Readout Trigger and Counted in DRALS Scaler 9 to 16
    [1] COOL => SC Ch9
    [2] MEAS0 => SC Ch10
    [3] MEAS1
    [4] New Step (NS)
    [5] SubTrig 1
    [6] SubTrig 2
    [7] SubTrig 3
    [8] SubTrig 4 =Sc Ch16

The Measgate Signal (logic high when in measurement window) is ANDed with 100 kHz clock. The strobed signal is put in DRALS DAQ ( to do).
ELOG V3.1.5-fc6679b