ID |
Date |
Author |
Category |
Subject |
Text |
 |
84
|
Sat May 17 21:06:52 2025 |
Rodolfo, Christopher, Kristian | Laser | New dye | We have exchanged the dye laser and filled
the dye pumps with fresh dye. We also noticed
that the seeder was off, we turned on again |
|
85
|
Sat May 17 21:27:17 2025 |
Wilfried, Rodolfo | Laser | Scraping the laser beam | The beam stabilization in not working properly.
So we have turned it off. We also scraped
the laser beam at the E-Cooler and bring |
|
86
|
Sat May 17 21:40:40 2025 |
Wilfried, Rodolfo, Hendrik, Ragandeep, Yuri | Laser | Eveningshift data runs |
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | |
|
87
|
Sun May 18 00:25:08 2025 |
Finn, Konstantin, Dimitrios | Laser | Nightshift data runs | Took over from afternoon shift and keep scanning
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | |
|
88
|
Sun May 18 01:47:56 2025 |
Konstantin | DAQ | Particle detector | The attachment shows the signal of the particle
detector for bunched beam (red, files 104-112)
coasting beam (black, files 113-117) as a |
|
89
|
Sun May 18 02:24:46 2025 |
Wilfried, Rodolfo, Carsten | Detectors | Antrieb Cu-Mirror defekt | On Saturday afternoon we moved the Cu mirror
to the inner position, however an issue appeared
when we tried to move the mirror to the "park" |
|
90
|
Sun May 18 04:33:46 2025 |
Dimitrios, Finn, Konstantin | Laser | Laser position | We changed the position of the laser back
to the position which was set up in [COLOR=blue][B][URL=https://elog.gsi.de/esr/E0038/85]E
85[/URL][/B][/COLOR] by changing the motor |
|
91
|
Sun May 18 08:06:55 2025 |
Danyal, Christopher, Jonas | Runs | morning shift | Took over from night shift and keep scanning
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | |
  |
92
|
Sun May 18 16:08:58 2025 |
Wilfried, Carsten, Rodolfo, Hendrik | Runs | Afternoon shift, continued measurements | Took over from morning shift and keep scanning
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | |
|
93
|
Sun May 18 21:30:20 2025 |
Wilfried, Rodolfo, Markus, Zoran | Accelerator | T-Scrapers, Update | Here are the right instructions to drive the
T-Scrapers inside the ESR Electron Cooler
|
|
94
|
Mon May 19 00:28:40 2025 |
Simon, Finn | Runs | Night shift measurement | Took over from afternoon shift and keep scanning
[TABLE border="1"]
Time |File | Ohmlabs | PTB 32 | PTB 33 | |
 |
95
|
Tue May 27 10:56:44 2025 |
Konstantin | DAQ | Common stop | The common stop was wired through a 1:2, and
subsequently through a 1:99 rate divider
channel. However, since the pulse width was |
|