HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
Nuclear hyperfine mixing in 229Th89+ 2024 |
Not logged in |
|
|
Message ID: 24
Entry time: Thu Jun 6 09:23:53 2024
|
Author: |
Konstantin Mohr |
Category: |
DAQ |
Subject: |
Timing |
|
|
The best way to adjust the bunch-laser timing is to start go4 (mbs must be running) from atppc023. Therefore use x2goclient and use the predefined session to access LXG1297. Start go4 as usual (Entry 10 + Entry 11).
With this preparation one can directly observe changes in the relative time between the common stop trigger and the photodiode signals (see Screenshot 3) when rotating the upper channel's fine adjustment wheel of the right dual timer above the laser table (see Screenshot 2, Don't touch the coarse adjustment wheel directly above!!!).
To ensure proper operation of Go4 make sure that it is closed in the ssh-session after the correct timing has been set!!! |
|
|
|