HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+ 2024  Not logged in ELOG logo
Message ID: 33     Entry time: Sat Jun 8 12:02:20 2024
Author: Carsten 
Category: Detectors 
Subject: Test Particle Detectors - Det South not working 
With the test beam from ESR I started to have a look at the PartDets.:
North outside: Works properly with a voltage of 1450 V
South outside (behind cooler) : no signal.

Later (when Danyal is here) we will check detectors cables etc., and if required put the north detector to position south and mount the untested (newly made, but with "old" material and PMT) spare detecotr to poistion north.
ELOG V3.1.5-fc6679b