HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
Nuclear hyperfine mixing in 229Th89+ 2024 |
Not logged in |
|
|
Message ID: 34
Entry time: Sat Jun 8 12:45:05 2024
|
Author: |
Carsten |
Category: |
DAQ |
Subject: |
Temporary change of RF signal |
|
|
The setting was 1.540974 MHz and division factor 68 (for a 200 MeV/u) beam, and the signal was taken from a signal generator.
I now switch to the "real" RF signal from the accelerator (~400MeV/u), that is 1.9693 MHz and the factor is set to 88.
This should be set back for laser tests or adjusted when we have the real decellerated beam. |