HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  Nuclear hyperfine mixing in 229Th89+ 2024  Not logged in ELOG logo
Message ID: 38     Entry time: Mon Jun 10 08:57:35 2024
Author: Carsten/Konstantin 
Category: DAQ 
Subject: Further Tests from Sunday 2024-06-09 - new voltages and tresholds for PMTs - testdata in files 
Voltages and thresholds increased for PMT Middle and North (in order to account for the ADC measurement in DAQ2

PMT South ("braodband") ET9422 1500 V thresh: 7
PMT Middle ("smallband") ET9423 2650 V thresh: 10
PMT North ("smallband") ET9423 2650 V thresh: 12


Tests with laser

Thresholds adjusted for PD SO and PD NO.
Smaller adjustements in the analysis cdoe of DAQ1 (directory 229Th) to deal with the proper alignment of laser steps (Step-spectra). Seems to solved now.

DAQ rate/trigger rate DAQ1 - interference with Labview
DAQ1 can be started without connection to Labview server after some timeout (~ 1min) or so the usual trigger rtate of 200 Hz can be seen in mbs (via: "sh acq" command)
If the Labview server is closed, e.g. during the run or between to laser runs - the DAQ rate drops to 30 Hz only. Very likely MBS is busy trying to fetch data from the non existing Labiew server.
The problem can be solved by leaving closing the the DAQ (MBS not Go4...) and restarting mbs/DAQ, e.g. via @shutdown, leave mbs, resl, start mbs, Qstartup, start acq.
Of course, also Go4 needs to be restarted to establish a new connection to MBS.
The DAQ rate of DAQ1 should be regularly checked with sh acq !


Test data
DAQ1: 005.lmd
DAQ2: 010.lmd
both rubbish, partially adjustments of threshilds etc.

~2.7e6 ions (238U92+)
201 laser steps 550nm, 549nm, 50 shots per step
DAQ1: 006.lmd
DAQ2: 011.lmd/012.lmd
Threshold for PD SO not adjusted

restart
DAQ1: 007.lmd
DAQ2 013-017.lmd

same with few 10^5 ions:
DAQ1: 008.lmd
DAQ2: 018-020.lmd
ELOG V3.1.5-fc6679b