HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  Nuclear hyperfine mixing in 229Th89+ 2024  Not logged in ELOG logo
Message ID: 8     Entry time: Fri May 31 16:49:52 2024
Author: Carsten 
Category: DAQ 
Subject: Wiring DAQ 1 
Started to Check the wiring.

Status as of 2024-05-31

Inputs into 1. DAQ /TDC/Scaler - List according to file TLdaInputDescription.h in directory ~/go4/229Th

Cobra_Busy, // 0:
Next_Laserstep, // 1:
Laserscan_Complete, //2 :
{"PMT_South", 3, {3,11}},
{"PMT_Middle", 4, {4,11}},
{"PMT_North", 5, {5,11}},
{"Empty0", 6, {}},
{"ParDet_South", 7, {}},
{"ParDet_North", 8, {}},
{"QSwitch_500us", 9, {}}, // Important to mitigate missing Q-Switch
{"EmptyA", 10, {}},
{"Channeltron", 11, {9}}, //not yet wired
{"Bunch HF", 12, {}}, //not yet wired
{"PD_NorthEast", 13, {}},
{"PD_SouthEast", 14, {}},
QSwitch, //15
DC_Trafo, //16
{"Injection", 17, {}},
U_ECooler, // 18
I_ECooler, // 19
{"P_Gun", 20, {}},
{"P_Coll", 21, {}},
{"Common_Stop", 22, {}}, //? P_coll two times????
Clock_1MHz, // 23
{"Empty1", 24, {}},
{"Empty2", 25, {}},
{"Empty3", 26, {}},
{"Empty4", 27, {}},
{"Empty5", 28, {}},
{"Empty6", 29, {}},
{"Empty7", 30, {}},
{"Empty8", 31, {}},

Checked also the connections from the CFD to DAQ 1 (ok)
input connections to CFD are as labelled on the black laser Messhütte panel

CFD channels:

0: PMT south
1: PMT niddle
2: PMT north
3: PMT copper (not used)
4: PD NO
5: PD SO
6: Part Det South
7: Part Det North
8: empty
9: XUV front (not used)
10: XUV back (not used)
11:
12: Master Osci Bunchng HF (Süd)
13: empty
14: empty
15: Master Osci Bunchng HF (Nord)

PD_NO and PD_SO are terminated with 50 Ohm at input (conflicts with 50 Ohm input termination of CFD)
ELOG V3.1.5-fc6679b