HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025  Not logged in ELOG logo
Message ID: 37     Entry time: Sat Jun 21 07:28:35 2025
Author: Arya, Julien, Wilfried 
Category: Laser 
Subject: Laser Timing 
We roughly adjusted the timing based on attachment 1, for ions to be in center of electron cooler (east arc), corrected for PMTs being 2.5m closer to the north on the west arc
then did a new 30 injection accumulation (10.8k counts on particle detector) and readjusted the timing to fine tune this
(attachment 2, first settings right peaks, adjusted towards left)

Then we did a 60 injection accumulation (only 7.6k counts?) to check the settings and shift the timing by half a revolution (324 ns = 98 bins)
(attachment 3, data saved in /data.local2/2025_229Th/2025_229ThDAQ1_0099.lmd with DAQ1).

Checked these settings and particle counts with another injection (2.8k counts)
(attachment 4, data saved in /data.local2/2025_229Th/2025_229ThDAQ1_0100.lmd with DAQ1)


Estimated bunch width: 20bins = 67ns;corresponds to 20/200 of 1 evolution, so about 12m
                                     assuming v+0.5c0: 11m
Attachment 1: Bildschirmfoto_IonBunch_PDs_2025-06-21.png  211 kB  Uploaded Sat Jun 21 08:34:00 2025  | Hide | Hide all
Bildschirmfoto_IonBunch_PDs_2025-06-21.png
Attachment 2: Bildschirmfoto_rough_timing_2025-06-21_07-22-59.png  192 kB  Uploaded Sat Jun 21 08:34:20 2025  | Hide | Hide all
Bildschirmfoto_rough_timing_2025-06-21_07-22-59.png
Attachment 3: Bildschirmfoto_timingcorrected_2025-06-21_08-21-53.png  219 kB  Uploaded Sat Jun 21 09:28:31 2025  | Hide | Hide all
Bildschirmfoto_timingcorrected_2025-06-21_08-21-53.png
Attachment 4: Bildschirmfoto_timing_final_2025-06-21_08-46-18.png  218 kB  Uploaded Sat Jun 21 09:46:53 2025  | Hide | Hide all
Bildschirmfoto_timing_final_2025-06-21_08-46-18.png
ELOG V3.1.5-fc6679b