HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025  Not logged in ELOG logo
This is a draft message, edit and submit it to make it permanent  
Message ID: 70     Entry time: Sat Jun 28 06:29:58 2025
Author: Stefan, Simon 
Category: Runs 
Subject: Morning shift 28.06. 
6:30 Problem with ion source, on-call service is called
7:30 There is a short in the ion source and it needs to be changed. Expected down time about 2h
10:30 Ion source was successfully changed, but while ramping up the source a power supply failed. Next on-call service is on their way to GSI.

Time Part. Det. Int SIS-intensity accumulations in ESR cooler-HV PTB K250 cooler-HV PTB red cooler-HV orange LMD-DAQ1 Files LMD-DAQ2 Files scan range(nm) number of positions dwell time (laser shots) n loops checked laser position mesytec rate ok comments
22:08 17000 2.5e9 30 104524 104527 104528 205 233 551.91 - 549.41 501 15 1 yes yes -
ELOG V3.1.5-fc6679b