HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025  Not logged in ELOG logo
Message ID: 70     Entry time: Sat Jun 28 06:29:58 2025
Author: Stefan, Simon, Konstantin 
Category: Runs 
Subject: Morning shift 28.06. 
6:30 Problem with ion source, on-call service is called
7:30 There is a short in the ion source and it needs to be changed. Expected down time about 2h
10:30 Ion source was successfully changed, but while ramping up the source a power supply failed. Next on-call service is on their way to GSI.
13:00 ions are back


We changed the dye as the laser intensity was quite low. That didnt help, so Konstantin came in to change the dye cell. That did help.

No scans during morning shift.
ELOG V3.1.5-fc6679b