HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Nuclear hyperfine mixing in 229Th89+ 2025  Not logged in ELOG logo
This is a draft message, edit and submit it to make it permanent  
Message ID: 73     Entry time: Sun Jun 29 06:11:49 2025
Author: Stefan, Konstantin 
Category: Runs 
Subject: Morning Shift 29.06. 


Time Part. Det. Int SIS-intensity accumulations in ESR cooler-HV PTB K250 cooler-HV PTB red cooler-HV orange LMD-DAQ1 Files LMD-DAQ2 Files scan range(nm) number of positions dwell time (laser shots) n loops checked laser position mesytec rate ok TE slits comments
06:09 3300 2.7e9 40 - - - 296 269 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5
08:49 16000 2.5e9 40 - - - 297 270 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5
09:10 4100 2.6e9 40 - - - 298 271 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5 slightly modified the laser position, which was necessary to ensure proper laser-ion superposition after retuning the laser, some bad injections from SIS
09:2X 16000 2.8e9 40 - - - 299 272 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5
09:59 2200 2.4e9 40 - - - 300 273 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5 One bad injection cycle between the previous measurement and this one. Particle detector reset lately
10:33 3800 2.0e9 40 - - - 301 274 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5
10:52 4200 2.1e9 40 - - - 302 275 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5
11:17 4100 2.1e9 30 - - - 303 276 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5
11:41 4400 2.1e9 30 - - - 304 277 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5
11:53 4600 2.1e9 30 - - - 305 279 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5 Bad (empty) injections from SIS
12:19 4600 2.5e9 30 - - - 306 279 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5 Potentially problems with transfer beam line
12:19 00 2.5e9 30 - - - 307 280 550.610 - 548.110 501 15 1 yes yes TE slits -9 +5.5 Potentially problems with transfer beam line We did a recalibration of the FCU. After this (7:40) a SIS power supply failure was detected, and we are waiting now for the on-call service. HHT cave access around 10:06 during a short break due to a source failure. Every once in a while we have empty shots from SIS/.
ELOG V3.1.5-fc6679b