Wed Jun 11 11:20:23 2025, Konstantin, Simon, DAQ, octal gate generator delays
|
We checked the set delays of the OG 8000 octal gate generator and compared them with the values measured before the Bi-beamtime (see [URL=https://elog.gsi.de/esr/E0038/34]entry
34[/URL]).
All values match within an uncertainty of <1ns
|
Fri Jun 6 14:27:10 2025, Rodolfo, Konstantin, Laser, MRC Beam Stabilization Presettings  
|
These are the settings for the Beam Stabilization from MRC.
Laser-beam energy ca. 18 mJ @ 275 nm |
Tue May 20 16:14:30 2025, Rodolfo, Simon, Detectors, PMT arrangement at ESR
|
This is the arrangement of the photomultipiers at the optical detection region at ESR for Thorium 2025
|
Wed Jun 4 16:18:57 2025, Rodolfo, Simon, Detectors, PMT dark count rates
|
I adjusted the offsets of the amplifiers in the cave and measured the dark count rates :
[TABLE border="1"]
|
Wed Jun 4 16:17:47 2025, Simon, Detectors, Nitrogen
|
The nitrogen supply for the PMTs is turned [B]ON[/B]. |
Mon Jun 2 16:36:57 2025, Carsten, Detectors, Mesycontrol
|
ssh -Y litv-exp@x86l-204
'mesycontrol' |