HOME ESR EXPERIMENTS LABS etc
overview Control System beam optics AP-network Vacuum NORTH ARC SOUTH ARC COOLER LINE TARGET LINE INJECTION
E01DD4A - proton-capture
  E01DD4A - proton-capture  Not logged in ELOG logo
Message ID: 1     Entry time: Mon Feb 24 09:04:48 2020
Author: Jan 
Subject: E127 Si detector installation 
Category: Status Update 
In 2019 the new UHV-grade Si detector for the E127 proton-capture experiment has been installed at this position.
Detector has been alined in height with the help of a line-laser and a test drive into the dipole chamber could be done, as the dipole section was vented at that time.

Bakeout for about 1 week was done with the help of a temp-sensor (pt100) next to the detector. See https://elog.gsi.de/esr/E127/21

Final alinement and remote test driving were done after bakeout, there was a significant effect on the vacuum pressure when moved inside.
See for details: https://elog.gsi.de/esr/E127/28
Attachment 1: det_on_holder.JPG  4.360 MB  | Hide | Hide all | Show all
det_on_holder.JPG
Attachment 2: det_in_chamber.JPG  4.051 MB  | Show | Hide all | Show all
Attachment 3: DSC_1823.JPG  4.584 MB  | Show | Hide all | Show all
Attachment 4: DSC_1825.JPG  4.369 MB  | Hide | Hide all | Show all
DSC_1825.JPG
Attachment 5: DSC_1826.JPG  4.666 MB  | Show | Hide all | Show all
Attachment 6: DSC_1829.JPG  4.772 MB  | Hide | Hide all | Show all
DSC_1829.JPG
Attachment 7: DSC_1832.JPG  4.147 MB  | Hide | Hide all | Show all
DSC_1832.JPG
Attachment 8: DSC_1836.JPG  4.212 MB  | Show | Hide all | Show all
Attachment 9: DSC_1844.JPG  4.349 MB  | Hide | Hide all | Show all
DSC_1844.JPG
ELOG V3.1.5-fc6679b