HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018
  masses & isomeres 2025  Not logged in ELOG logo
Message ID: 134     Entry time: Thu Apr 3 23:23:20 2025
Author: Zhang Min, Zhou Xu 
Category: Accelerator 
Subject: Beam injection change 
The SIS operator says that FRS doesn't need beam now, ESR will receive the full SIS beam extraction every 3 secs overnight. All the secondary beams are injected into ESR from now on.
Attachment 1: 2025-04-03_23-21-03-095.png  371 kB  | Hide | Hide all
2025-04-03_23-21-03-095.png
ELOG V3.1.5-fc6679b