A Bio-REM detector on the roof of ESR caused an alarm and shut down the whole accelerator.
Too much primary beam going to ESR, noe we avoid it by catching the primary beam at TE4 slits.
The distribution on current grids looks liek in the LISE simulation, we cut at 5mm.
The beam come sin three charge states tehouter ones 82+, 81+ anyway do not make it to ESR, we need to cut also the 80+ at least half.
Then the dose rate on ESR roof is much lower 0.8 uSv/h -> 0.2 uSv/h. |